Installation includes the following
- Concrete removal and repair. *We don’t match specialty floor finishes or floor covering.
- High-density plastic sump crock with heavy-duty cover.
- Zoller M53 1/3hp cast iron submersible pump (3yr Parts Warranty).
- Zoller quiet check valve.
- 1 1/2″ schedule 40 PVC discharge line up to 50′.
- Dedicated 15amp electrical outlet.