Installation includes the following

  • Concrete removal and repair.  *We don’t match specialty floor finishes or floor covering.
  • High-density plastic sump crock with heavy-duty cover.
  • Zoller M53 1/3hp cast iron submersible pump (3yr Parts Warranty).
  • Zoller quiet check valve.
  • 1 1/2″ schedule 40 PVC discharge line up to 50′.
  • Dedicated 15amp electrical outlet.

Contact Capital Today

"*" indicates required fields

This field is for validation purposes and should be left unchanged.